Efficient, Fast, & Cost-Effective Solutions:
Our strategic network and circular economy model allows us to swiftly source long-lead and costly items such as electrical and mechanical equipment, generators, and even historic building materials.
Mitigate delays and budget overruns.
- Case Study #1: Meter stack for Multi-family development in NJ
- Challenge: A multi-family developer’s subcontractor had struggled to obtain a Siemens resi stack POWMOD from the supplier for 6 months and needed to have one installed asap to pass inspection.
- Solution: Upon contact from the developer’s Project Manager, SUSA located the specified unit (new) and quickly provided a quote w/ a lead time of one week. Upon receipt of approval, SUSA had the unit to the developer in less than one week.
- Case Study #2: 150 KVA Transformer for TI in KC
- Challenge: Following a miss on a substitution in the electrical submittal process, a 150 KVA transformer was the required solution. Lead time and cost of a new transformer would put the project in jeopardy.
- Solution: SUSA had a pre-owned transformer readily available from a recent project, and delivered the transformer to site in one week, at a substantial cost savings.